Paul B. Kilonsky
Cell (740)632-2575
Home (740) 264-5128
E-mail: pskilonsky@netzero.com
CREDENTIALS: Several years in Project Management as cost analyst, cost estimating, planning, startup
and field experience. (Mechanical Level II, VT 1 Level II, CSW Training, IPC-A-61D,
P6 Primavera, MS Excel, Power Point, Passport, MS Word, MS Project, PT Level II)
EDUCATION: Ohio University – Athens, Ohio
Bachelor of Business Administration
Study Abroad Program-German Language & Literature, Salzburg, Austria,
EXPERIENCE: Lead Scheduler - Footbridge, Andover, MA
June 23, 2014 - Current
Develop and status a schedule in P6 for several pipeline projects carrying oil and gas for Enbridge in
Superior, WI. Working with project managers assigned to particular parts of the project to develop
meaningful reports and logic to demonstrate impact on critical path. Building a conviction for the
schedule as a meaningful manufacturing tool to help manage pipeline projects.
Lead Scheduler – CB&I, Chicago, IL
May 20, 2014 – June 12, 2014
Worked on the Fukushima Project at Clinton Nuclear station in Illinois. Writing and developing
plans for the Fukushima task force and incorporating it into the on-line schedule. Working with the
project manager and engineers to develop a strategy for back up cooling water in light of a major
catastrophe. This included writing and updating progress at different project levels in Primavera P6.
Lead Scheduler – Footbridge, Andover, MA
April 7, 2014 – May10, 2014
Updating of schedule for I & C shop at the Waterford 3 nuclear plant in New Orleans, LA during
refueling. This consisted of any logic changes and managing of the schedule for all I&C maintenance
and post maintenance activities associated with refueling process. Keeping the schedule current with
a manageable number of activities each day. Providing histograms to level resources for work in
Primavera P6 scheduling software.
Lead Scheduler – D&Z NPS, Oak Harbor, Ohio
September 2013 – March 21, 2014
Providing scheduling for all supporting craft on the steam generator replacement at the Davis-Besse
Plant for NPS. Upkeep of the online schedule activities with the station and developing of the steam
generator replacement support project schedule. Leveling of craft resources for the replacement
project while continued reporting of online activities before breaker open. Keeping a metrics of total
activities and completes for each craft. Running two updates meetings per 12 hour shift to maintain
schedule adherence and status in Primavera P6 8.3.
Lead Scheduler - Advoco , Orlando, Fla
March 2013 – July 2013
Assisted Siemens in writing schedule and logic with engineer support in P6. Provided layouts and
reports for project management with different scopes of work. Produced histograms for leveling
project and to justify workforce. Maintained schedule hourly and made modifications when needed
from emerging scope on stator replacement for the generator on unit one at the Arkansas Nuclear One
plant.
Terminal Scheduler - Buckeye Transfer, Columbiana, OH
Nov 2012 – March 2013
Oversight of equipment operations for materials supplied to gas and oil service companies. Had
ongoing contact with administrator from the oil and gas industry who provided material for ongoing
operation of fracking activities. This included inventory management and truck scheduling.
Lead Scheduler – Advoco, Orlando, Fla
Dec. 2011- Oct, 2012
Updated the outage schedule hourly for Siemens utilizing Primavera P6. Created layouts, developed
logic between activities as well as adding activities, loaded resources and printed variance reports.
Supported Project Management by providing critical path reporting . Provided daily updates to the
Area FPL Project Managers for daily progress on the Uprate Project at Port Saint Lucie Power Plant.
Senior Scheduler – Advoco, Orlando, Fla
Sep. – Dec 2011
Utilizing Primavera P6 provided Siemens daily support for schedule updates, critical path analysis,
verified durations to go, produced and distributed updated schedules in PDF format to keep Siemens
Project Management informed. Assigned constraints and worked with Gantt charts for an uprate on
unit one turbine for Siemens during U1R33 refueling outage at Point Beach.
Quality Control - ITLS, Pittsburgh, PA
June – Sept 2011
Provided QC support for General Electric for the building dry storage spent fuel tanks.
This included performing PT’s, receipt inspection, and verifying measurements for fit ups and quality
input and review of procedures.
Lead Night Shift Scheduler - Advoco, Orlando, Fla
Feb – May 2011
Using Primavera P6 updated daily schedule status, tracked schedule variances for project management.
Supplied daily updates of a Level III integrated schedule to produce schedule charts/graphs that
depict’s actual and forecast progress of the individual Sub Projects. Improved logic between assigned
constraints on the unit two turbine for Siemens during U2R31 refueling outage at Point Beach.
Quality Control - System One, Waltz Mill, PA.
Quality Inspector – System One, New Stanton, PA
Quality Inspector – System One, Madison, PA
Aug ’10 – Mar 2011
Reviewed project documents and procedure reviews for compliance, examine incoming parts for
Westinghouse, verity compliance at hold points on main pump feed water motors and auxiliary motors
Performed inspections based upon requirements and specifications of various components that would be
installed in nuclear power plants around the United States per 10 CFR 50.
Aug ‘08 – April 2010
April - May 2010
Confirmed pre and post measurements from mechanical stress process on hot leg and cold leg nozzles for
MSIP and PCI during U1R23 outage at St. Lucie. Supported updating the work schedule on
Westinghouse activities.
Quality Inspector - System One, Madison, PA
Confirmed pre and post measurements from mechanical stress process on hot leg and cold leg for
Westinghouse MSIP at Comanche Peak . Interfaced with project supervision and management to ensure
complete understanding of issues in order to achieve an effective resolution
March - April 2010
Quality Inspector – System One, Madison, PA
March – March 19, 2010
Performed pre and post measurements from mechanical stress process on hot leg and cold leg nozzles for
Westinghouse MSIP at D.C. Cook. Interfaced with project supervision and management to ensure
complete understanding of issues in order to achieve an effective resolution
QA Inspector - System One, Madison, PA
QA Inspector - System One, Madison, PA
Nov - Dec 2009
Verified correct location of plugs for Westinghouse on steam generator tubing that were to be sealed
from operation during Sequoyah U2C16 outage.
Sept 2009 – Nov 2009
Review of completed project documentations, verified compliance of hand-holes and man-ways on steam
generator, evaluated specifications and procedures for Westinghouse at Beaver Valley for 2R12 outage.
Chemical Cleaning Plant Support - System One, Madison, PA
Nov 2008 – Dec 2008
Aided work of chemical cleaning on steam generator, manipulated valves of piping for chemicals used in
cleaning, disassembled and installed primary and secondary manways on steam generator at Point Beach
Power Plant, Point Beach, WI
TRAINING:
Trained on Primavera in Client Server (P6)
System One Technical Training Center, Weirton, WV
July 2010
Apr 2008 to Jun 2008
Received diploma for successfully completing 448 hours of formal training in the following classes:
Magnetic Particle Testing, Liquid Penetrant Testing, Visual Examination, Radiography, Ultrasonic Testing,
QC/Mechanical Inspection, Welding Inspection Technology, Quality Concepts, NDE Mathematics and
Intro to Nondestructive Testing
References available upon request